Latest Answer: Static Testing is not a functional Testing. Static Testing includes verification documents, processes etc ...
Latest Answer: Requirements, Designs, Code, Test Plan ...
Latest Answer: If we Prepared Test cases / scripts, then the advantages could be1) we cant say how much test cases we have executed sofar2) with test cases and Traceability Matrix we can prove that all the requirements have been met3) if we have any issues we can point ...
Latest Answer: Test Bed is explain in which Hardware,OS,Browser,Software,Testing tool we are going to execute our testing....Regards,Prasanna.S.R ...
Latest Answer: The standard deliverables after completing testing:Test Trace-ability Matrix, Test Plan, Testing Strategy, Test Cases, Test Scenarios, Test Scripts, Test Data, Test Results, Test Summary Report, Release Notes, Tested Build. ...
What is the traceability Matrix and when it will be prepared (before or after preparing the Test Cases)? By whom it will be prepared?
Latest Answer: In Normal Testing scenario, either the build manager or the Test & developement lead will install the working build with its GUI and give us a green flag to test the application.but when you take product testing, (anti virus, os etc) a test engineer ...
Hi, I'm looking for some applications written in Visual Basic 6.0 or lower for trying some automation testing using QTP in my home PC. Also a web application which I can download and install on my pc and testing using QTP. Can anyone suggest some websites where I can download this sort of applications. Thanks in Advance
Latest Answer: By reviewing the Requirement Documents and attending team meetings we do analyize the requirements. ...