What is cement..?

Asked By: JITENDRA | Asked On: Oct 30th, 2013

Answered by: sachin upadhyay on: Jul 30th, 2014

Cement is very good binding material, and it is important part of mortar.

Answered by: bhadani reshma on: Jul 27th, 2014

Cement is very strong material which is used in build strong building and pool.

What is the minimum length of the wall after which expansion joint is to be provided?

Asked By: vishal ranjan verma | Asked On: Nov 9th, 2007

Answered by: Biplab on: Jul 22nd, 2014

According to IS For rcc strs-45m
Load bearing brick strs-30m
Boundary wall-10m
Overhanging members or facia etc-6m

Answered by: kuldeep kumar on: Jun 6th, 2014

3 TO 4 CM GAP IN EVERY 30 METER DISTANCE

What is fineness of cement?

Asked By: bhavik | Asked On: Nov 15th, 2011

What are the type of tests and name of test equipments?

Answered by: sadabraj singh on: Jul 19th, 2014

Fineness is very important characteristics of cement & is described as specific surface of all the particles i.e the summation of surface areas of all the cement grain in one gram of cement. 

Answered by: shahanth on: Jan 13th, 2013

Fineness is tells about the particle distribution of cement. Fineness of is cement expressed in terms of total surface area of unit weight of of cement. Tests 1) Sieve analysis ------->I.S.sieve ...

Dmc piling

Asked By: mrray | Asked On: Feb 10th, 2010

What is the process of executing dmc piling?

Answered by: govardhan reddy on: Jul 15th, 2014

Direct mud circulation

Answered by: Sruthi on: Jul 31st, 2012

DMC- direct mud circulation Bentonite is pumped in to the bore at the time of drilling so as to stabilise the sides of the bore hole. Water is also pumped in.As the drilling proceeds, betonite is was...

Efficient beam

Asked By: deemech | Asked On: Mar 19th, 2010

Which is more efficient - rectangular beam or a circular beam? Give example?

Answered by: Aafan Shahid on: Jul 10th, 2014

Rectangular Beam is more efficient

Answered by: muhammadarif on: Mar 3rd, 2014

Whats formula of circle steel length

Rcc - column, sla, beams and cover

Asked By: cool.aruna | Asked On: Jul 28th, 2008

Explain what are column, sla, beams and cover?

Answered by: naveed on: Jul 1st, 2014

Footing:50mm
column:40mm
beam:25mm
slab:20mm

Answered by: seenu on: Jun 26th, 2014

Column - 40 mm on longer dimension; 25mm on shorter dimension;
Slab - 25mm maximum in case of residential or commercial buildings; 40mm in case of deck slab in flyover or grade separator which has a higher depth of 600mm;
Beams - 25mm on all sides;

Quantity survey billing - excaVATion material

Asked By: Sathishkumar | Asked On: Mar 29th, 2014

ExcaVATion material is the property of excaVATion contractor,. Yes or no

Answered by: Hammad on: Jun 30th, 2014

NO

Answered by: bikkumalla rakesh on: Jun 27th, 2014

No

Quantity survey billing - rate excaVATion

Asked By: Sathishkumar | Asked On: Mar 29th, 2014

Generally rate excaVATion with blasting is more than that with chiseling...Say yes or no and give reason

Answered by: Prakash on: Jun 16th, 2014

Yes. but generally in city area or near habitate places blasting prohibited.

There are many restriction on store & procurement of gelatine.

That's why people consider chisling method

Answered by: raghavendra on: Apr 5th, 2014

No

Knowledge of cad software and the versions you have used?

Asked By: CivilGuru | Asked On: Apr 13th, 2006

Answered by: Rajiv Ratan Singh on: Jun 9th, 2014

2014 is user friendly

Answered by: Enge qasim ali on: May 26th, 2014

2006 is awsome

Construction technology

Asked By: harshsinha | Asked On: Dec 7th, 2012

How much of the strength of concrete comes from post-production curing?

Answered by: narendra reddy on: Jun 9th, 2014

1day-16%,3-day-40%,7-day=65%,21day=90%28day=99% and 100%strength achieves only after 28 days and we need to check for target mean strength which is necessary

Answered by: Engr qasim ali on: May 26th, 2014

After 7 days 66%
after 14 days 89%
after 28days 100%

Least count

Asked By: ksaravvv | Asked On: Jun 5th, 2010

What is mean by least count? Tell the least count of dumpy level and theodolite?

Answered by: Biplab Kisan on: Jun 2nd, 2014

Least count is defined as the highest degree of accuracy of measurement in the instrument or the smallest reading that can be measured by the instrument...So for theodolite it is 20" and for dumpy level it is 5mm.

Answered by: fawumi ademola samuel on: May 30th, 2014

Least count is the minimum reading you can read from an instrument. for dumpy level is 5mm and theodolit is 20s

Cube test

Asked By: KALPESH GHARAT | Asked On: Jul 18th, 2011

I am casting raft and get the cube .After seven days test the cube that was pass as per rule so I will testing after 28 day ? Yes or no? And why?

Answered by: srinivas on: Jun 2nd, 2014

Yes, we should test the cubes for 28 days. Because the concrete gets full strength in 28 days. In 7 days the concrete get only 70% of strength and in 28 days gets 100% of strength.

Answered by: vinoth.N on: Mar 11th, 2013

Yes.

Inverted and hidden beams

Asked By: jislam | Asked On: Feb 16th, 2010

What are inverted beams and hidden beams ?

Answered by: Balbir Singh on: May 29th, 2014

During construction of ground slab specially in foundation the beam are design as inverted beam and in the floor slab where their is no provision of beam and wall are to raised on the slab a provision of hidden beam is given which is embedded in the slab itself

Duties and responsibilities of civil site engineer

Asked By: kamal agra | Asked On: Mar 12th, 2009

What are the duties and responsibilities of civil site engineer in road and building construction?

Star Read Best Answer

Editorial / Best Answer

Answered by: Debiprasad Banik

View all answers by Debiprasad Banik

Member Since Apr-2009 | Answered On : Apr 8th, 2009

While in duty of supervision of building, you should ensure that the concrete mixing is according to the grade specified. While supervision of road, you should ensure that the different layers of the road are laid in proper thickness.

Answered by: Anuraag wagley on: May 4th, 2014

There are two types of site civil engineer , first job is a supervisory one if he works with the consultant, in this case he needs to make sure that the document in hand is the correct designed and is...

Answered by: Vikas Bamal on: Aug 31st, 2011

He is responsible of all work at site. Quality control in mixing ratio. Good type of material used in construction. Regular checking level of road, beam, column. Check the all level according to drawing. Good cummnication with supervisor, forman & workers.

EexcaVATion level readings

Asked By: Sathishkumar | Asked On: Mar 29th, 2014

We get excaVATion level readings more accurate with total station, say yes or no ( and give reason)

Answered by: michael servanez on: Apr 25th, 2014

yes of course because excavation level is more accurate of what we can do or much better to use.,meaning to say is a comprehensive mechanical tools to determines the "no".,of calculus "in re".,accorda...

Answered by: M.P.PAREKH on: Apr 19th, 2014

Yes because accuracy is more

Quantity survey billing engineer - maintenance of jcb.

Asked By: Sathishkumar | Asked On: Mar 29th, 2014

Jcb hiring rate includes maintenance of jcb....Yes or no

Answered by: M.P.PAREKH on: Apr 19th, 2014

NO

Answered by: Amol Naik on: Apr 17th, 2014

Yes, the supplier incorporates the amount of maintenance, in the quotes, for the said work.

Required quantity of steel

Asked By: jaganmodi | Asked On: Mar 9th, 2012

What is the method of calculate the requirement steel quantity in 1 cum rcc.

Answered by: rajaneesh kumar ojha on: Apr 12th, 2014

M S Tmt bal waight

Answered by: RAGHAVENDRA on: Apr 5th, 2014

As per thumb rule the steel quantity /Cum varies from structure to structure like for Beam its 7.5 Kg/Cum for columns its around 12 kg/Cum so it varies

Quantity survey billing engineer - disposal of derbies

Asked By: Sathishkumar | Asked On: Mar 29th, 2014

Disposal of derbies any activity completion in contractors scope yes or no

Answered by: Raghavendra on: Apr 5th, 2014

Its all depend upon the lead needed to shift the debris as known the lead increase the cost of transport increases which may not come in the scope of the contractor

Quantity survey billing engineer - rate of verified tile flooring

Asked By: Sathishkumar | Asked On: Mar 29th, 2014

Rate of verified tile flooring is less than that of dADO...Yes or no and give reason

Answered by: Raghavendra on: Apr 5th, 2014

Yes the cost of material varies with respect to floor to adjoining as the in flooring surface area covering is more rather than dado item.

Quantity survey billing engineer - butt filling question

Asked By: Sathishkumar | Asked On: Mar 29th, 2014

Butt filling in pop works is in contractors scope...Yes or no give reason

First | Prev | | Next | Last Page

 

 

Ads

Connect

twitter fb Linkedin GPlus RSS

Ads

Interview Question

 Ask Interview Question?

 

Latest Questions

Interview & Career Tips

Get invaluable Interview and Career Tips delivered directly to your inbox. Get your news alert set up today, Once you confirm your Email subscription, you will be able to download Job Inteview Questions Ebook . Please contact me if you there is any issue with the download.