GeekInterview.com
Answered Questions

When do u know that testing is over?

Asked By: keyur2476 | Asked On: Sep 21st, 2006

Answered by: PrafullaSutradhar on: Sep 18th, 2012

Teating prosses depends on software company but still has a guideline. When produce meets with it requirement, exit
criteria, also sometime over budget, time is over but test is not finish.

Answered by: cnananthan on: Apr 19th, 2012

We can arrive at the decision of Testing is over based on the following criteria:

* Level of Confidence on the functioning is greater than the Customers Confidence.

* Known Bad (i.e.Tests Failed) + Unknown (i.e.Tests not run) is less than Known Good (i.e.Tests Passed)

What is an exit and entry criteria in a test plan ?Please explain

Asked By: Goldie | Asked On: Jul 22nd, 2006

Answered by: michaly on: Sep 20th, 2011

In exit Criteria: I like to add to Santhoshi Kotha thorough answer: Risk. everything based on the Risk!

Answered by: Santhoshi Kotha on: Sep 16th, 2011

The Entry andExit criteria are clearly mentioned in the Testplan: The Entry criteria is: 1. All the integration exit criteria has been sucessfully met. 2. All the installation documents have been comp...

What is use case? What is the diffrence between test cases and use cases?

Asked By: testuse | Asked On: Nov 9th, 2005

Answered by: PriyabrataBhol on: Apr 15th, 2013

Usecase is sequence of flows to achieve certain requirement.

Answered by: dimple on: Feb 16th, 2013

use case is noting but user story.
test case is step by step method to validate requirements.

What is the difference between the test case and a test script

Asked By: Raji | Asked On: Oct 28th, 2005

Answered by: dimple on: Feb 16th, 2013

Test case is step by step method to validate requirements for manual testing.

Test script is step by step method to validate requirements for Automation testing.

Answered by: mohammad ali on: Feb 2nd, 2013

Test case term is used in manual test.
Test script term is used in automation test.

Describe to the basic elements you put in a defect report?

Asked By: sheetal | Asked On: Oct 19th, 2005

Answered by: FarhanaB on: Nov 13th, 2011

The basic element in a bug report:

1)bug id number
2)test case steps
3) test case description
4) screen shot of the defect
5)actual result
6)expected result
7) Priority
8)Severity

Answered by: SRIDHAR DOMMATI on: Nov 7th, 2011

summery of the bug
priority
severity
description
author of defect(tester)
detected by
detected on
reproducible steps
scree shot
escalating to
expected value
actual value

What is the job of quality assurance engineer? Difference between the testing & quality assurance job.

Asked By: Beena | Asked On: Sep 16th, 2005

Answered by: Santhoshi Kotha on: Apr 26th, 2011

QA is the entire software development process-monitoring and improving the process, to make sure that any agreed upon standards and procedures are followed,ensuring the problems are found and deal wit...

Answered by: Divyavel on: Oct 30th, 2008

Testing involves Quality control and quality Assurance.Quality assurance is giving adiquate confidence to the customers

What is walkthrough and inspection?

Asked By: Interview Candidate | Asked On: Sep 7th, 2005

Answered by: sri on: Oct 4th, 2012

Inspection is where the testers are made to understand the application and its functionalities . In walk through meeting the documents like business requirement doc, design documents were distribute...

Answered by: Santhoshi Kotha on: Apr 26th, 2011

An inspection is more formalised than Walkthroughs,typically it involves 3-8 people including moderator,reader & recorder to take the notes.The subject of inspection is typically a document such a...

How do you ensure the quality of the product?

Asked By: Interview Candidate | Asked On: Sep 10th, 2005

Answered by: Inayat Ali Khan on: Jan 21st, 2013

When the product works according to the specified requirement without any issue and meets the satisfaction of the client.

Answered by: Sweety Verma on: Apr 17th, 2012

Product that work every time ,any time and all time to specifications.

Qa testing : what are the key elements for creating test plan?

Asked By: Interview Candidate | Asked On: Sep 9th, 2005

Star Read Best Answer

Editorial / Best Answer

Answered by: BISWAJIT PANI

Answered On : Jun 15th, 2006

1) Objectives

2) scope

3) Approach

4) Testing Methodology

5) Assumption

6) Risk

7) Contigency paln

8) Delivarable

9) Defect Reporting

10) Efforts and Estimation

11) Entry and Exit Criteria

12) Roles and Responsibilities

13) Schedules

14)Testing environment

etc.......

Regards,

Biswajit pani ( 09986183456)

panibiswajit@yahoo.com

Answered by: Sridhar Dommati on: Nov 7th, 2011

the question is "what are the key elements for creating Test Plan"? but all the people telling the contents of a Test Plan according to my view... "Test plan is a master document..which contains s...

Answered by: santhishini on: Sep 21st, 2011

quality assurance for preventing defects and qc for detecting defects.............
qa is done by developer and qc done by test engineer

Interview Question

 Ask Interview Question?

 

Career Counselling

 Have Career Question?

 Ask Chandra

 Ask Only Career questions.

Follow us: