What can you tell about the project if during testing you found 80 bugs in it?
Latest Answer: A Project with large number of defects doesn't mean that the development was not accurate or it is not developed as per requirements. below is a case when we faced large number of defects--we have used crystal report in one of major reporting ...
The test plan achieves the objective of _______ Answer 1 Everybody concerned with the project being in sync with respect to the scope, responsibilities, deadlines and deliverables. Answer 2 Everybody
Latest Answer: Ans.3 ...
what are the 18 different kpas (key process area)define each of them?
Latest Answer: Thanks for explaining. ...
What is the meaning of Effort Variacne , Schedule variance , Residual Defect Density , and Productivity? and what are the difference ?
Latest Answer: A bench mark in a solid, immovable surface of known elevation used for surveying. The term "bench mark" has been highjacked from the surveying world to mean a standard of performance or quality. Thus the term "up to the ...
Latest Answer: The role of Quality Assurance is to provide management with assurnace that the product being developed will be of adequate relaibility, with provide the desired functionality, will be delivered on time at a reasonable cost. That is, unless the Quality ...
Hi Any one is to define test cases for this this scenarios.Scenario 3: Local File Store Document - Add, Retrieve, Open, Print, Email, Deletea) A Document Author adds a Word document to a local file store
Latest Answer: The most impact is that QA make sure that the company is following the quality standard or bench mark etablished according the IEEE or CMM. ...
Latest Answer: TRM (Test Responsibility Matrix): meanswhich type of testing technique has to be chosen to corresponding usecase. ...