CHERALA
Answered On : Aug 30th, 2011
The bentonite suspension is pumped into the bottom of the hole through the drill rods and it overflows at the top of the casing.The water jet is let through the piling chiesel which comes out from bottom with Mud
Login to rate this answer.
satya Narayan Prasad
Answered On : May 21st, 2012
full form of DMC Pilling
Login to rate this answer.
Sruthi
Answered On : Jul 31st, 2012
DMC- direct mud circulation
Bentonite is pumped in to the bore at the time of drilling so as to stabilise the sides of the bore hole. Water is also pumped in.As the drilling proceeds, betonite is washed out at the top. Concreting is done when the density of the betonite+water mix is less than the density of concrete so that concrete settles down. The density of the betonite mix can be found out by taking a sample of the washed out betonite mix.