If A can do a particular work in 8 days. B can do the work in 6 days. By C joining with them, they can finish the work in 3 days. If Rs.540 was paid to them, what is the share of C?
Answer posted by Harry on 2005-05-19 04:01:57: 67.5
RE: If A can do a particular work in 8 days. B can do the work in 6 days. By C joining with them, they c...
Harry is correct !
Worked shared between A B & C are 37.5 49.98 12.51 respectively and hence Rs 570 should be shared accordingly. So C will get Rs 67.5 (A-Rs.202.5 B-Rs.270)
A's work of one day is 1/8. b's one day work is 1/6.( A+B+C)'s one day work is 1/3.so c's one day work is 1/3-(1/8+1/6) 1/24 distribute 540 in the ratio of A:B:C :: 8:6:24.341.05 will be c's share.