Why we need to do PCC?

Asked by: manmohansingh | Member Since Feb-2009 | Asked on: Feb 23rd, 2009

View all questions by manmohansingh

Showing Answers 1 - 13 of 13 Answers
S.KALAIYARASAN

Answered On : Apr 25th, 2009

View all answers by S.KALAIYARASAN

P.C.C. is the base coarse of R.C.C. Sand filling is cushion base, so P.C.C. is required.

  
Login to rate this answer.
digzcivil

Answered On : May 1st, 2009

View all answers by digzcivil

PCC is done so as to provide a strong & stable base for fundation, it also provides a flat base for upcoming foundation rather than undulated base.

  
Login to rate this answer.
pankajgrai

Answered On : Jun 30th, 2009

View all answers by pankajgrai

PCC is done so as to provide base for foundation to avoide direct contact of foundation with soil.As the Grade of comcrete of PCC and Foundation is different it also provide material difference for ground bactrial effect on foundation.

  
Login to rate this answer.
zuhair1972

Answered On : Jul 15th, 2009

View all answers by zuhair1972

1. To avoid direct contact of foundation with soil2. Some time it can decrease the stresses to the soil

  
Login to rate this answer.

PCC means Plain Cement Concrete.i.e, concrete without reinforcement.PCC is constructed to transfer the load above the PCC to the soil below.

  
Login to rate this answer.

The mixture of cement, FINE aggregate (sand) and  coarse aggregate is called plain cement concrete (PCC) PCC is mainly used for following purposes 1. It is used as a protective layer for the RCC above so that water from the RCC is not absorbed by the earth below.2. Provides a base for the concrete and also helps workers to set out the structure above in a easier way3.act as a cover to reinforced cement concrete i.e. resist corrosion of steel bars in footings 4.moisture available in soil should not absorbed by R.C.C footings which causes corrosion of reinforcement

Yes  2 Users have rated as useful.
  
Login to rate this answer.
fayyaz

Answered On : Jul 27th, 2011

P: water
c: cement
c:concrete

  
Login to rate this answer.
lokesh rajwade

Answered On : Jul 30th, 2011

For footing of a foundation

  
Login to rate this answer.
vishnu prakash soni

Answered On : Aug 3rd, 2011

For a level surface which is of same property of foundation rest on it. it prevents foundation from natural salts and underground seepage.

  
Login to rate this answer.
Vikas Bamal

Answered On : Aug 31st, 2011

PCC is used in bottom of footing & plinth beam.

  
Login to rate this answer.
biswajit das

Answered On : Mar 6th, 2013

PCC is plain cement concrete. it is done to provide a hard and level surface against the soft and undulation soil below the rcc foundation.

  
Login to rate this answer.
nikhil

Answered On : Oct 15th, 2014

Rcc

  
Login to rate this answer.
pushparaj

Answered On : Oct 20th, 2014

The mixture of cement, FINE aggregate (sand) and coarse aggregate is called plain cement concrete (PCC) PCC is mainly used for following purposes

1. It is used as a protective layer for the RCC above so that water from the RCC is not absorbed by the earth below.

2. Provides a base for the concrete and also helps workers to set out the structure above in a easier way

3.act as a cover to reinforced cement concrete i.e. resist corrosion of steel bars in footings

4.moisture available in soil should not absorbed by R.C.C footings which causes corrosion of reinforcemen

  
Login to rate this answer.

Give your answer:

If you think the above answer is not correct, Please select a reason and add your answer below.

Ads

Connect

twitter fb Linkedin GPlus RSS

Ads

Interview Question

 Ask Interview Question?

 

Latest Questions

Interview & Career Tips

Get invaluable Interview and Career Tips delivered directly to your inbox. Get your news alert set up today, Once you confirm your Email subscription, you will be able to download Job Inteview Questions Ebook . Please contact me if you there is any issue with the download.