GeekInterview.com
  I am new, Sign me up!
 
GeekInterview.com  >  Placement Papers  >  TCS  >  COBOL
Go To First  |  Previous Question  |  Next Question 
 COBOL  |  Question 27 of 44    Print  
Study the five expressions and the class to which they belong:
S.N. Expression Class
1 "SPACES" Figurative constant
2. "Depreciation Schedule Non-numeric literal
3. "12%" Non-numeric literal
4. INTEREST-DUE Non-numeric literal
5. ZEROES Figurative constant
Which of the following statement is true?
(a) 1 and 3 are incorrect
(b) 1 and 4 are incorrect
(c) 3 and 4 are incorrect
(d) All are correct

  
Total Answers and Comments: 0 Last Update: N/A   
  
 Sponsored Links

 

No answers are posted for this question yet.
Be the first to answer it!


 Related Questions

Consider the following piece of code 01 GROSS-PAY 05 BASIC-PAY PIC 9(5) 05 ALLOWANCES PIC 9(3) if BASIC-PAY has a value 1000 and ALLOWANCES has a value of 250, what will be displayed by the statement DISPLAY GROSS-PAY a.1250 b.01000250 c.01250 d.1.250

Consider two data items 77 W-A PIC 9(3)V99 VALUE 23.75 77 W-B PIC ZZ9V99 VALUE 123.45 after the statement MOVE W-A TO W-B what will be W-B value? a.123.75 b.b23.75 (where b indicates space) c.023.75 d.invalid move

Consider the statement (incomplete) IF(A NUMERIC) DISPLAY A the variable A can be a.NUMERIC b.ALPHABETIC c.ALPHANUMERIC d.NUMERIC OR ALPHANUMERIC

What if any, is the syntax error in the following piece of code 01 B PIC A(7) 02 C PIC 9(4) IF(B NUMERIC) ADD 10 TO C a.the condition in the if statement is wrong b.noting is wrong c.because C is initialised.ADD 10 TO C is wrong d.both B and C shoud have same size.

Observe the following code 01 A1 05 B PIC 99 05 C PIC X(4) 01 A2 05 B PIC 99V99 05 C PIC A(4) pick out the valid statement from the following a.A1 and A2 can not have sub-ordinates b.A1 and A2 can have the same sub-ordinates but must have same PIC clause c.there is nothing wrong d.A1 and A2 can have same sub-ordinates provided they are not at 01 level

Study the following 01 A PIC 99V0 VALUE 5 01 B PIC 9V9 VALUE 6 01 C PIC 99V9 VALUE 2.5 01 D PIC 99 VALUE 3 COMPUTE A ROUNDED B C = A+B*C/D ON SIZE ERROR PERFORM PRINT-ERROR the comments of A.B.C after execution of the above statement are a.A=10 B=0 C=10 b.A=10 B=9.9 C=9.9 c.A=10 B=0 C=9.9 d.A=10 B=6 C=10

Study the data discriptions and answer the questions given below i)01 ORDER RECORD 05 OUT-HEADER PIC X(50) 05 ITEM-COUNT PIC 99 05 OUT-ITEM PIC X(20) OCCURS 1 TO 20 DEPENDING ON ITEM-COUNT ii)01 NAME-AND-ADDRESS 05 N-AND-A-LINE OCCURES 5 05 LINE-LENGTH PIC P9 05 N-AND-A-CHAR PIC X OCCURS 1 TO 20 DEPENDING ON LINE-LENGTH iii)01 SALES-LIST 05 SALESMAN-COUNT PIC 99 05 SALES PIC 9(6) OCCURS 1 TO 100 DEPENDING ON SALESMAN-COUNT iv)01 ORDER-RECORD 05 NO-OF-BRANDS PIC 99 05 BRAND-PURCHASED

C1 C2 C3 are three conditions whose TRUTH values are as folloes. C1-TRUE C2-FALSE C3-TRUE A,B,C are defined as given below A:C1 AND(NOT C2) OR C3 B.(NOT C1) OR (NOT C2 AND NOT C3) C.(C1 OR C2)AND C3 D.C1 AND C2 OR C3 given the above information which of the following statements are valid? a.only A,B and C are TRUE b.only A,C and D are TRUE c.A,B,C and D are TRUE d.only C and D are TRUE

Consider the following FD FILE-1 01 REC-1 PIC X(80) ...... WORKING-STORAGE SECTION 01 W-REC PIC X(90) ........ PROCEDURE DIVISION FIRST-PARA ....... READ FILE-1 INTO W-REC AT END MOVE 1 TO EOF-FLAG which of the following is true with respect to the above? a.REC-1 will contain nothing and W-REC will contain the contains of the record read b.REC-1 and W-REC contain the same data c.syntex is invalid and error will occur d.REC-1 and W-REC must be of same size

Consider the following PROCEDURE DIVISION entry OPEN EXTEND IN-FILE identify the correct statement a.organization of IN-FILE is sequential and records can be added in the beginning b.organization of IN-FILE is sequential and records can be added in the end c.organization of IN-FILE is indexed and records can be added in the beginning d.organization of IN-FILE is indexed and records can be added in the end


 Sponsored Links

 
Related Articles

C++ Pure Virtual Function and Base Class

C Pure Virtual Function and Virtual Base Class In this C tutorial you will learn about pure virtual function declaration of pure virtual function and virtual base class virtual base class and how to implement a virtual base class explained with examples mosgoogle center What is Pure Virtual Function
 

Planning and choosing the correct ERP

Planning and choosing the correct ERP It is very common to think that implementing a new software is an easy topic and can be solved in a few days However this is not always the case There are some systems that require more time than others for implementation and even more previous considerations ER
 

How to Access C++ Class Members

How to Access C Class Members In this C tutorial you will learn how to access Class members dot operator or class member access operator difference between struct and class and  scope resolution operator mosgoogle center It is possible to access the class members after a class is defined an
 

What are the limitations with switch statement?

Switch statement is a powerful statement used to handle many alternatives and provides good presentation for C program. But there are some limitations with switch statement which are given below: Logical operators cannot be used with switch statement. For instance case k>=20: is not allowe
 

goto Statement

Why to avoid goto in C C has goto statement but one must ensure not to use too much of goto statement in their program because its functionality is limited and it is only recommended as a last resort if structured solutions are much more complicated. First let us understand the goto statement, its
 

Operator, Operand and Expression in C

Operator, Operand, and Expression in are symbols which take one or more operands or expressions and perform arithmetic or logical computations. Types of operators available in C are as follows: Arithmetic Assignment Logical/relational Bitwise These have operators under each
 

Tried and True Resume Writing Rules

You can have all the experience, personality, and credentials you need to land the best jobs in any area of the world, but if you don’t know how to put them onto paper in the form of a resume, you may be unemployed. Writing a resume isn’t as simple as scribbling down your past ex
 

UML Elements : Class Diagram

UML Elements UML 2 0 is comprised of a total of 13 diagrams If you wish to understand these diagrams they should be organized based on a hierarchy For UML a diagram is an element which must define which things should be modeled in a system mosgoogle center Introduction to Class Diagram In this arti
 

PHp Tutorials : Regular expressions

Regular expressions In this PHP Tutorials you will learn about Regular Expressions viz Basic PCRE Syntax Character classes preg match preg match and Extracting data with regular expressions mosgoogle Basic PCRE Syntax A regular expression pattern is a string consisting of plain text and pattern me
 

Quality Aspects to Check While Writing COBOL Program

Quality Aspects to Check While Writing COBOL Program This article gives a general list which the programmer must check while delivering programs developed in COBOL This can also be used as a general checklist for checking quality of the COBOL program developed mosgoogle Quality is a vital factor fo
 

About Us -  Privacy Policy -  Terms and Conditions -  Contact -  Ask Question -  Propose Category -  Site Updates 

Copyright © 2005 - 2009 GeekInterview.com. All Rights Reserved

Page copy protected against web site content infringement by Copyscape