what is the size of W-REC in the following
01 W-REC
05 A PIC 9(4)V99
05 B READLINES A
10 C PIC XX
10 D PIC S9(4)
05 E OCCURS 7 PIC ZZ.ZZ
05 F OCCURS 5
10 G PIC ZZ.ZZZ99
10 H OCCURS 3
15 J PIC 9(3)
15 K PIC V99
a.177
b.161
c.180
d.none of yhe above

  
Total Answers and Comments: 1 Last Update: September 28, 2005   
  
 Sponsored Links

 
 Best Rated Answer
Submitted by: Praveen Kumar
 

Ans is b ie 161.

Explanation is :  

01 W-REC
05 A PIC 9(4)V99
05 B READLINES A
10 C PIC XX
10 D PIC S9(4)

As B redefines A so they will occupy the same memory of size : 6


05 E OCCURS 7 PIC ZZ.ZZ

This will occupy : 5 * 7 = 35 bytes

05 F OCCURS 5
10 G PIC ZZ.ZZZ99
10 H OCCURS 3
     15 J PIC 9(3)
     15 K PIC V99

This will occupy : 5 * (9+ 3*5) = 120  bytes



Above answer was rated as good by the following members:
Mainframer18
September 28, 2005 05:47:22   #1  
Praveen Kumar Member Since: September 2005   Contribution: 6    

RE: what is the size of W-REC in the following 01...

Ans is b ie 161.

Explanation is :

01 W-REC
05 A PIC 9(4)V99
05 B READLINES A
10 C PIC XX
10 D PIC S9(4)

As B redefines A so they will occupy the same memory of size : 6


05 E OCCURS 7 PIC ZZ.ZZ

This will occupy : 5 * 7 35 bytes

05 F OCCURS 5
10 G PIC ZZ.ZZZ99
10 H OCCURS 3
15 J PIC 9(3)
15 K PIC V99

This will occupy : 5 * (9+ 3*5) 120 bytes


 
Is this answer useful? Yes | NoAnswer is useful 1   Answer is not useful 0Overall Rating: +1    

 Related Questions

What if any, is the syntax error in the following piece of code 01 B PIC A(7) 02 C PIC 9(4) IF(B NUMERIC) ADD 10 TO C a.the condition in the if statement is wrong b.noting is wrong c.because C is initialised.ADD 10 TO C is wrong d.both B and C shoud have same size.

Study the following 01 A PIC 99V0 VALUE 5 01 B PIC 9V9 VALUE 6 01 C PIC 99V9 VALUE 2.5 01 D PIC 99 VALUE 3 COMPUTE A ROUNDED B C = A+B*C/D ON SIZE ERROR PERFORM PRINT-ERROR the comments of A.B.C after execution of the above statement are a.A=10 B=0 C=10 b.A=10 B=9.9 C=9.9 c.A=10 B=0 C=9.9 d.A=10 B=6 C=10

Study the data discriptions and answer the questions given below i)01 ORDER RECORD 05 OUT-HEADER PIC X(50) 05 ITEM-COUNT PIC 99 05 OUT-ITEM PIC X(20) OCCURS 1 TO 20 DEPENDING ON ITEM-COUNT ii)01 NAME-AND-ADDRESS 05 N-AND-A-LINE OCCURES 5 05 LINE-LENGTH PIC P9 05 N-AND-A-CHAR PIC X OCCURS 1 TO 20 DEPENDING ON LINE-LENGTH iii)01 SALES-LIST 05 SALESMAN-COUNT PIC 99 05 SALES PIC 9(6) OCCURS 1 TO 100 DEPENDING ON SALESMAN-COUNT iv)01 ORDER-RECORD 05 NO-OF-BRANDS PIC 99 05 BRAND-PURCHASED

Consider the following FD FILE-1 01 REC-1 PIC X(80) ...... WORKING-STORAGE SECTION 01 W-REC PIC X(90) ........ PROCEDURE DIVISION FIRST-PARA ....... READ FILE-1 INTO W-REC AT END MOVE 1 TO EOF-FLAG which of the following is true with respect to the above? a.REC-1 will contain nothing and W-REC will contain the contains of the record read b.REC-1 and W-REC contain the same data c.syntex is invalid and error will occur d.REC-1 and W-REC must be of same size

What is the size of W-REC in the following 01 W-REC 05 A PIC 9(4)V99 05 B READLINES A 10 C PIC XX 10 D PIC S9(4) 05 E OCCURS 7 PIC ZZ.ZZ 05 F OCCURS 5 10 G PIC ZZ.ZZZ99 10 H OCCURS 3 15 J PIC 9(3) 15 K PIC V99 a.177 b.161 c.180 d.none of yhe above

Consider the following code: 77 A PIC 99V99 VALUE 55.35 77 B PIC 99V999 VALUE 32.754 ADD B TO A ON SIZE ERROR DISPLAY "ERROR!!!"What will be the result ? (a) A=88.10, B=32.754 (b) A=87.00 B=32.754 (c) A=87.10 B=32.754 (d) ERROR!!! will be DISPLAYed on the screen.

Consider the following:77 A PIC 9(10) 77 B PIC 9(10) 77 C PIC 9(19) MULTIPLY AB BY B GIVING CWhich of the following is true ?(a) The execution of the above may result in size error. (b) The execution of the above will result in size error. (c) The definition of C is invalid resulting in compilation error. (d) No error will be thee and the program would proceed correctly.

OCCURS clause is used in the DATA DIVISION on data names at (a) 01 level (b) 77 level (c) 88 level (d) any level from 02 to 49


 Sponsored Links

 
Related Articles

Quality Aspects to Check While Writing COBOL Program

Quality Aspects to Check While Writing COBOL Program This article gives a general list which the programmer must check while delivering programs developed in COBOL This can also be used as a general checklist for checking quality of the COBOL program developed mosgoogle Quality is a vital factor fo
 

COBOL Interview Questions

COBOL Interview Questions This article provides Mainframe Interview Questions covering Cobol questions For more Interview Questions Answers related to Mainframe click on links provided at the end of each question set mosgoogle COBOL 1 a What is the difference between write and move in COBOL b What i
 

About Us -  Privacy Policy -  Terms and Conditions -  Contact -  Ask Question -  Propose Category -  Site Updates 

Copyright © 2005 - 2009 GeekInterview.com. All Rights Reserved

Page copy protected against web site content infringement by Copyscape