Test Planning should begin before the design phase itself.You can plan testing when you get the requirements,so that you can set the testing requirements,the schedule,aspects to test,decide on personnel and any training required etc.Actual testing can begin once the system is being built.
Bala Krishna .Thota
Apr 17th, 2005
test planning is done by testlead. As a test lead test planning begin when TRM is finalized by project manager and handover to the testlead. here test lead have some responsibilities those are, 1. testing team formation 2.identifying tactical risks 3.preparing test plan 4. reviews on test plans
jithendra
May 12th, 2005
what is TRM
balu
Dec 5th, 2005
after required ment gathering
in loadrunner after interface testing
martin
Jan 1st, 2021
traceability requirements matrix, i think its actually RTM, but maybe im wrong.
Its essentially a spreadsheet with requirements(in scrum they are usually stories as the business model does not require too deep documentation), their ids, and the ids associated with the story test cases. I usually split them from the test cases, but from the knowledge sources cases and the association element were on one spreadsheet, i guess it depends on the technical plan.