                    Concrete Cube Compressive TestWhat is the formula for concrete cube compressive test by Accelerated Curring Tank (ACT) method? 
- 
                    What is fineness of cement?What are the type of tests and name of test equipments? 
- 
                    Least CountWhat is mean by least count? Tell the least count of dumpy level and theodolite? 
- 
                    Duties and Responsibilities of Civil Site EngineerWhat are the duties and responsibilities of civil site engineer in road and building construction? 
- 
                    
- 
                    RCC - Required Binding wire(for 1.0MT steel), Nails & Lubricant (for 1.0 Sqm shuttering) 
 
 In RCC what are the required quantities for:
 
 1. Binding wire required for 1.000 MT of TMT Reinforcement bars.
 2. Nails for 1.00 Sqm Shuttering.
 3. Lubricant/Black oil/ Deisel/ grease for 1.00 Sqm Shuttering.
- 
                    Efficient BeamWhich is more efficient - rectangular beam or a circular beam? Give example? 
- 
                    Required Cement quantitywhat is the method of calculation for require Cement qty. in 1 Cum brick work with CSM 1:6. 
- 
                    ShutteringWhat is Shuttering? How it is done on site? 
- 
                    Volumes of Wet and Dry SandHow to differentiate the volumes of wet and dry sand / soil? 
- 
                    Deflection v/s Deformationwhat is the Difference between DEFLECTION AND DEFORMATION ? Explain 
- 
                    

 
  
  