What does PDCA mean?

A) Plan-Do-Check-Act
B) Prepare-Do-Cost-Act
C) Plan-Do-Control-Action
D) Prepare-Do-Control-Action

Showing Answers 1 - 15 of 15 Answers

Brunda

  • Dec 9th, 2005
 

Plan
Do
Check
Act

  Was this answer useful?  Yes

Plan: Plan every activity in a project with proper analysis and considerations for risks and other constraints

Do : Work on the activity as per the plan and complete it

Check: Check the work you have done with Quality Standards and correct the anomolies

Act : Do the root cause analysis and correct the process to prevent the occurance of errors in future.