The main difference between Inverter and UPS is switching time.Inverter switching time is inverter switching time is more than UPS , inverter Takes approx 500 millisecond to switch , that’s why ...
Now assume any type of load; for simplicity I?m assuming it a only resistive load.
And let it be ?R? per phase.
For Delta connected load:
Calculation for per phase power; PD= I2R
Where I ? load current (per phase)
And,
I = ?3Vs/R{as line voltage of the supply is directly applied to the phase of the delta load}
So,
Pd = (?3Vs/R)2R = 3Vs2/Rwatts per phase.
For 3 phases:
P3D = 3Pd = 3*3Vs2/R = 9Vs2/R watts.
Now for Star connected load:
PS = I2R = (Vs/R)2R = Vs2/R watts
For 3 phases: P3S = 3PS = 3 Vs2/R watts
Conclusion:
P3S / P3D =3Vs2/R / 9Vs2/R = 1/3
It may be better concluded by drowing figures. If any variations, can connect to me through karan.sorout@gmail.com
RUP KAMAL KUTUM
Feb 3rd, 2018
Well first you assumed voltage per phase as Vs and Line voltage as sqrt(3) x Vs: Which is for star connection. Then, you assumed the same thing for Delta Connection(where line and phase voltages are t...
Anbumozhi R
Dec 3rd, 2017
Power is Same. Whether it is star to Delta conversion or Delta to star conversion. Power is 1:1