Which of the following will enable this candidate to involved quick in regression.
A New member has joined the testing team of an application which is in version 3.5. Which of the following will enable this candidate to involved quick in regression. 1. By going through existing test cases and previous test execution results. 2. By going through interaction matrix of feature and functionality. 3. By going through performance testing document. 4. By going through all the requirement...
-
Which of the following would you do.
If you are in the beginning of the project where your role is test the product, you observe that you do not have sufficient details in the requirement specification to start your test design work. Which of the following would you do. 1. Once the initial build is available, explore and learn the details of the product 2. Start designing the test cases with the assumption of the functionality 3. Attempt...
-
Which of the following will enable this candidate to involved quick in regression
A New member has joined the testing team of an application which is in version 3.5. Which of the following will enable this candidate to involved quick in regression. 1. By going through existing test cases and previous test execution results. 2. By going through interaction matrix of feature and functionality. 3. By going through performance testing document. 4. By going through all the requirement...
-
Which of the following information does it contain that would be most suitable to generate test data
Data dictionary was created during the requirement analysis stage of a software engineering project.Which of the following information does it contain that would be most suitable to generate test data 1. Names of all data elements that should be stored in persistent storage 2. Names of all classes to be developed 3. Names of all functions to be developed and there prototypes. 4. Names definition and...
-
Which of the following would you do?
If you are in the beginning of the project where your role is test the product, you observe that you do not have sufficient details in the requirement specification to start your test design work. Which of the following would you do. 1. Once the initial build is available, explore and learn the details of the product 2. Start designing the test cases with the assumption of the functionality 3. Attempt...
-
Which of this is NOT TRUE for test harness?
1. Should report test results 2. Should run many test scripts 3. Should collect test verdicts 4. Should verify test cases.
-
You have a system that can work under XP,98 and OS and IE 6.5, IE 7 and Firefox and .Net 1.0, .Net 2.0 and .Net 3.0 frame work
You have a system that can work under XP,98 and OS and IE 6.5, IE 7 and Firefox and .Net 1.0, .Net 2.0 and .Net 3.0 frame work How many Test cases will you have if you use All pillar method. 1. 9 2. 27 3. 13 4. 12
-
The metrics of High number of defects re-opened and new defects logged against verified defects during QA
The metrics of High number of defects re-opened and new defects logged against verified defects during QA 1.Defect report did not carry complete information regarding the defect 2. degree of interaction between the modules are high 3. there are high no of defects in some modules. 4. regression test need to be improved.
-
In which of the instances it not worth of automating the tests
1. When we just cant do some tests like load and stress manually 2. When we want to reduce test execution time. 3. When product life cycle is short. 4. When test cases have to be run repeatedly