-
Cable Cost
A telephone cable is to be run from a junction point on the bank of a river 900 meters wide to an office that is located 3000 meters downstream on the opposite bank. If the cost of laying cable under water is Rs. 5 per meter and that of laying overhead on land is Rs. 4 per meter, find the point downstream where the cable is to cut across the river.(a) 450(b) 1800(c) 2800(d) 2100(e) 2700
-
Increase in Percentage
The productivity of a team of programmers is given by the function P(N) = 4000 √N, where N is the total strength. Find the percentage change in productivity if the strength of the team is increased by 1%.(a) 0.75% (b) 0.25%(c) 0.5%(d) 1%(e) 2%
-
A Family Planning Weekend Trip
A family, planning a weekend trip, decides to spend not more than a total of 8 hours driving. By leaving early in the morning, they can average 40 miles per hour on the way to their destination. Due to the heavy Sunday traffic, they can average only 30 miles per hour on the return trip. What is the farthest distance from home they can plan to go?
-
Cut Circular Pizza
There is a circular pizza with negligible thickness that is cut into 'x' pieces by 4 straight line cuts. What is the maximum and minimum value of 'x' respectively? (WITH EXPLAINATION)