Geeks Talk

Prepare for your Next Interview


Welcome to the Geeks Talk forums.

You are currently viewing our boards as a guest which gives you limited access to view most discussions and access our other features. By joining our free community you will have access to post topics, communicate privately with other members (PM), respond to polls, upload content and access many other special features. Registration is fast, simple and absolutely free so please, join our community today!

If you have any problems with the registration process or your account login, please contact contact us.

implementation failure

This is a discussion on implementation failure within the SAP R/3 forums, part of the Enterprise Solutions category; why an implementation fails in R/3,pls add ur comments....

Go Back   Geeks Talk > Enterprise Solutions > SAP R/3
Register Blogs FAQ Tag Cloud Calendar Mark Forums Read
  #1 (permalink)  
Old 02-13-2008
Junior Member
 
Join Date: Feb 2008
Location: INDIA
Posts: 4
Thanks: 2
Thanked 0 Times in 0 Posts
RAVIBABUB1 is on a distinguished road
Thumbs down implementation failure

why an implementation fails in R/3,pls add ur comments.
Reply With Quote
Sponsored Links
  #2 (permalink)  
Old 02-13-2008
Junior Member
 
Join Date: Feb 2008
Location: hyd
Posts: 4
Thanks: 0
Thanked 0 Times in 0 Posts
thirumal_reddyd is on a distinguished road
Re: implementation failure

Quote:
Originally Posted by RAVIBABUB1 View Post
why an implementation fails in R/3,pls add ur comments.
implementation through user exits/ customer exits will fail in version upgradation, where as badi's will not fail in version upgradation.
Reply With Quote
  #3 (permalink)  
Old 08-12-2009
Junior Member
 
Join Date: Aug 2009
Location: Pune, India
Posts: 4
Thanks: 0
Thanked 0 Times in 0 Posts
kiranmujumdar is on a distinguished road
Re: implementation failure

HI RAVIBABUB1,

Many practicle Reasons are there by which SAP R/3 Project Implementation is fail at many client places.
Please check following reasons list, i hope it will help to get you answer -

1] Very Poor Project Management team at SAP Implementation partner side.
2] Total project implementation work is done without reference to ASAP project
implementation methodology, given by SAP.
Loop holes in setting project goals, less skillful team finalization, poor project plan,
poor or less project documentation at each project phase, Poor quality check at each
project phase.
3] time to time Guideline is to be taken from industry specific SAP Experts.
4] Poor clients existing business study with legacy systems used at client side.
5] Project Manager by implementation side should have very good SAP R/3 implementation
experience. like he should be through with his core module and should be able to
support other two modules at least.
6] Missing decisions in Project Authorization hierarchy, decision making authorities.
Team finalization and Reporting in the project implementation battle field.
7] Missing Client side project team finalization, Business Process owners, Core users.
8] Standard Business process best practices available or given by sap should be
studied well. and implementation with reference to that.
9] Implementation partner should be able to convince to client that, SAP is not only
ERP its a ultimate business solution. Instead of saying - Nothing is their
which i cannot configure or process in SAP, practicle results are shown to client
with acceptance from the business process owners.
10] SAP Illogical project authorities [Who have less SAP actual experience] must be
removed from that point. because they always try to show their Legacy
experience without comparing them with SAP Skills.
For example, We need Project Manager for Construction Project Implementation,
and we heir one person that have very good construction experience, but SAP
experience 0, believe me it will cause new drama at each project phase.
11] Many clients always try to remind the SAP team that, their legacy is much better
than SAP, i suggest to them that they must go with their legacy, as they don't want
ultimate solutions through the legend SAP R/3.
12] 2-3 clients i saw, project was implemented very good, they run their business with
SAP for 1-2 years. But they stopped using that because of the Cost of Maintaining the
system.

HU .......
these are some reasons which cause project failures according to my experiance.

Cheers !
Reply With Quote
Reply

  Geeks Talk > Enterprise Solutions > SAP R/3

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are Off


Similar Threads

Thread Thread Starter Forum Replies Last Post
phases of implementation ashish.mandaogade SAP R/3 4 07-04-2009 03:15 AM
Windows start service failure webindian2007 ASP.NET 1 03-30-2009 04:12 AM
unexpected TDBMS failure code 3704 Geek_Guest Data Warehousing 0 10-08-2007 05:33 PM
Hard Drive Inspector allows you to predict a possible failure of the HDD before this JobHelper Geeks Lounge 0 02-20-2007 06:50 AM


All times are GMT -4. The time now is 05:45 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2010, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.3.1
Copyright © 2005 - 2010 GeekInterview.com. All Rights Reserved