CMM levels

can anyone explain CMM levels
Reply With Quote
Sponsored Links
  #2 (permalink)  
Old 09-16-2007
Contributing Member
 
Join Date: Nov 2006
Location: India
Posts: 79
Thanks: 3
Thanked 15 Times in 10 Posts
j_madhuri is on a distinguished road
Re: CMM levels

The cmm is designed to be an easy to understand methodology for ranking a company's it related activities. The cmm has six levels 0 – 5. Level 0 – not performed level 1 – performed informally level 2 – planned and tracked level 3 – well-defined level 4 – quantitatively controlled level 5 – continuously improving level 0: not performed level 0 is common for companies that are just entering the it field. At this level there are few or no best practices. Level 1: performed informally at level 1 consistent planning and tracking of it activities is missing and deliverables are accomplished via “heroic” effort. “heroic” effort means that a team might work long hours in order to build a particular application; however, there are very few it standards and reuse/sharing is minimal. Fortune 500 companies and large government organizations are at a cmm level of 1. Level 2: planned and tracked level 2 has it deliverables that are planned and tracked. In addition, there are some defined best practices within the enterprise (e.g. Defined it standards/documents, program version control, etc.). Some repeatable processes exist within an it project team/group, but the success of this team/group is not transferable across the enterprise level 3: well-defined it best practices are documented and performed throughout the enterprise. At level 3 it deliverables are repeatable and transferable across the company. This level is a very difficult jump for most companies. Not surprisingly, this is also the level that provides the greatest cost savings. Level 4: qualitatively controlled companies at level 4 have established measurable process goals for each defined process. These measurements are collected and analyzed quantitatively. At this level, companies can begin to predict future it implementation performance. Level 5: continuously improving at level 5 enterprises have quantitative (measurement) and qualitative (quality) understanding of each it process. It is at this level that a company understands how each it process is related to the overall business strategies and goals of the corporation. Every programmer should understand how each line of sql will assist the company in reaching their strategic goals.
Reply With Quote
The Following 4 Users Say Thank You to j_madhuri For This Useful Post:
  #3 (permalink)  
Old 06-25-2008
Junior Member
 
Join Date: Jun 2008
Location: india
Posts: 20
Thanks: 2
Thanked 1 Time in 1 Post
amresh08 is on a distinguished road
Re: CMM levels

In CMM the successes and failures of the project are studied and changes to the processes are recommended. It describes the process information content recommended by the CMM. The process checklists are further refined into checklists for:
• roles
• entry criteria
• inputs
• activities
• outputs
• exit criteria
• reviews and audits
• work products managed and controlled
• measurements
• documented procedures
• training
• tools
CMM has five levels-

Level 1: The organization achieves the specific goals of the respective process area(s).

Level 2: The organization institutionalizes a managed process for the respective process area(s).

Level 3: The organization institutionalizes a defined process for the respective process area(s).

Level 4: The organization institutionalizes a quantitatively managed process for the respective process area(s).

Level 5: The organization institutionalizes an optimizing process for the respective process area(s).
Reply With Quote
Reply

  Geeks Talk > Software Testing > Quality Center


Thread Tools
Display Modes


Similar Threads

Thread Thread Starter Forum Replies Last Post
what are the levels of software testing raajyeshaditthiya Testing Issues 9 4 Days Ago 06:30 AM
what are contained in 6 KPs levels under CMM Geek_Guest Geeks Lounge 0 06-26-2007 07:50 PM
How to do the performance tuning at various levels praveenb6 Data Warehousing 2 04-18-2007 01:24 AM
Types and Levels of Testing in Programming Lokesh M Testing Issues 1 10-14-2006 12:46 AM
Why are Levels defined like this GregMark MainFrame 0 10-01-2006 05:33 PM


All times are GMT -4. The time now is 09:17 AM.


Powered by vBulletin® Version 3.6.8
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.1.0
Copyright © 2008 GeekInterview.com. All Rights Reserved