    Waterfall Model

    Hi

    Please State
    What are the advantages and disadvantages of Waterfall model?

    Thanks
    Srik


  2. #2
    Moderator
    Join Date
    Oct 2005
    Answers
    305

    Re: Waterfall Model

    In Waterfall model every phase is implemented in a sequential order.

    Waterfall model is suitable when the specification and requirements are clearly stated and the project is smaller in size.

    In a Waterfall model the output of one phase forms the input of the next phase.

    This concept actually turn as its disadvantage i.e., whe a mistake occurs in a particular phase, the same mistakes gets carried over to the last phase.

    Waterfall model is time intensive process and almost provides little or no option to change user requirements.


  3. #3
    Junior Member
    Join Date
    Oct 2007
    Answers
    2

    Smile Re: Waterfall Model

    Advantage:
    Waterfall model is used where the duration of project is very less,and it is best for small projects.
    Disadvantage:
    This model is useful only when the requirements are freezed(or not changing).


  4. #4
    Junior Member
    Join Date
    May 2010
    Answers
    1

    Re: Waterfall Model

    verification and validation


  5. #5
    Junior Member
    Join Date
    Apr 2010
    Answers
    11

    Re: Waterfall Model

    Advantages of Waterfall Model:
    1. Because of availability of well-defined outputs at each stage, the progress of the project will be evident to the management
    2. Project monitoring is easy because of the visible outputs at each stage
    3. As it is a simple model, it is followed in a large number of organization, particularly for commercial projects
    4. This is suitable for short duration project
    5. No rework and result is high quality product

    Disadvantages of Waterfall Model:
    1. Not suitable for change driven project
    2. Not suitable for large project
    3. Its uniform and steps are sequence
    4. For change driven project, Modified Waterfall Model is used


Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
About us
Applying for a job can be a stressful and frustrating experience, especially for someone who has never done it before. Considering that you are competing for the position with a at least a dozen other applicants, it is imperative that you thoroughly prepare for the job interview, in order to stand a good chance of getting hired. That's where GeekInterview can help.