Results 1 to 3 of 3

Thread: Bug Life Cycle Activities

  1. #1
    Junior Member
    Join Date
    Sep 2005
    Answers
    19

    Bug Life Cycle Activities

    In bug life-cycle, List the activites between New and Assigned states?


  2. #2
    Expert Member
    Join Date
    Apr 2006
    Answers
    124

    Re: Bug Life Cycle Activities

    Activites in Bug Life Cylce :
    New->Open->Assigned->Accepted->Resolved->Closed
    New->Open->Assigned->Rejected->Reopened->Resolved->Closed
    New->Open->Assigned->Rejected->Closed
    New->Open->Assigned->Deferred


  3. #3
    Junior Member
    Join Date
    Nov 2006
    Answers
    12

    Re: Bug Life Cycle Activities

    for status is new

    once the developed application released to the testing department.upto that time there is no defects, the test engineer only test that data.initiallywhenever the defect is identified newly then he will set the status as new or open.

    for assigned status

    some builds are released parallally testing is done. whenever the new changes are incorporated by the developers, if the test engineer not aware of those changes then he will raise them as defects, but the developer will set the status as as per design it is assigned. eg: the requirements ductment updations while developing, if the TE not aware of updates he raises this new changes are defects developer can set status as asper design

    if any doubts in manual testing pls ask
    madhav_sus@yahoo.co.in


Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
About us
Applying for a job can be a stressful and frustrating experience, especially for someone who has never done it before. Considering that you are competing for the position with a at least a dozen other applicants, it is imperative that you thoroughly prepare for the job interview, in order to stand a good chance of getting hired. That's where GeekInterview can help.
Interact