Geeks Talk

Prepare for your Next Interview


Welcome to the Geeks Talk forums.

You are currently viewing our boards as a guest which gives you limited access to view most discussions and access our other features. By joining our free community you will have access to post topics, communicate privately with other members (PM), respond to polls, upload content and access many other special features. Registration is fast, simple and absolutely free so please, join our community today!

If you have any problems with the registration process or your account login, please contact contact us.

rendezvous in load runner

This is a discussion on rendezvous in load runner within the LoadRunner forums, part of the Software Testing category; Hi guys, in Load runner while using rendezvous point, it will push the groups of vusers to run state at a particular time. i want to know after pushing to ...

Go Back   Geeks Talk > Software Testing > LoadRunner
Register Blogs FAQ Tag Cloud Calendar Mark Forums Read
  #1 (permalink)  
Old 12-11-2007
Banned
 
Join Date: Jul 2007
Location: Chennai
Posts: 36
Thanks: 0
Thanked 3 Times in 3 Posts
balajip82 is on a distinguished road
rendezvous in load runner

Hi guys, in Load runner while using rendezvous point, it will push the groups of vusers to run state at a particular time.

i want to know after pushing to the run state , whether i want to manually disable the rendezvous or no need while scenario is running.

Because rendezvous is once again taking some vusers to rendezvous state.

pls clarify.
Reply With Quote
Sponsored Links
  #2 (permalink)  
Old 12-11-2007
Expert Member
 
Join Date: Oct 2007
Location: Mumbai
Posts: 354
Thanks: 4
Thanked 58 Times in 47 Posts
bizzzzzare will become famous soon enough
Smile Re: rendezvous in load runner

Hi Balaji,

You dont have to manually code for completing a Rendezvous point. It is not similar to lr_start_transaction which has to have an lr_end_transaction mandatorily.

Once you set a rendezvous point, at scenario time all vusers are made to wait at the rendezvous point until all vusers reach the same point. Once done, scenario proceeds again normally.

Rendezvous points are usually used when we want all the vusers in the application to wait untill completion of a particular action say - DB Refresh or Data Refresh.

Cheers....
__________________
Regards,

V.Umesh Krishnan
QA Consultant
Reply With Quote
  #3 (permalink)  
Old 12-17-2007
Moderator
 
Join Date: Oct 2007
Location: Frankfort, KY
Posts: 283
Thanks: 3
Thanked 54 Times in 36 Posts
Anshoo_Arora is on a distinguished road
Re: rendezvous in load runner

You can comment out the rendezvous, delete it, or add/remove them from one of the menus in the Controller section which I can't seem to recall.
Reply With Quote
Reply

  Geeks Talk > Software Testing > LoadRunner

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are On
Pingbacks are On
Refbacks are Off


Similar Threads

Thread Thread Starter Forum Replies Last Post
Load Runner villjuj LoadRunner 2 07-13-2009 04:10 AM
QTP Script in Load Runner for Load Testing rohits_1982 QTP 2 08-13-2008 04:51 AM
Static IP in Load runner balajip82 LoadRunner 1 11-08-2007 12:17 AM
My load runner gets crashed Geek_Guest LoadRunner 1 09-06-2007 11:48 AM
LOAD RUNNER _VIEWSTATE value smoin LoadRunner 3 07-08-2007 03:33 PM


All times are GMT -4. The time now is 07:55 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.3.1
Copyright © 2009 GeekInterview.com. All Rights Reserved