Prepare for your Next Interview
This is a discussion on Run the MRP for newly created material within the SAP R/3 forums, part of the Enterprise Solutions category; Is it possible to to run the MRP for newly created material which is having all views? If yes, how?...
|
|||
|
Re: Run the MRP for newly created material
To run MRP the following settings must be done in Configuration even though u hadve created the material with all views.
Activate MRP for the plant and create a variant for the Planning file entry. In easy access Basic data 1: Material status MRP1:Mrp type these are mandatory for running mrp for any material |
![]() |
|
| Thread Tools | |
| Display Modes | |
|
|
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Material valuation in different plant? | arulsjc | SAP R/3 | 0 | 05-18-2007 04:26 PM |
| How to get the timestamp when it is created | Geek_Guest | Unix/Linux | 1 | 04-22-2007 04:07 AM |
| How can i access methods of those DLLs created in 1.1 | Geek_Guest | ASP.NET | 1 | 02-26-2007 10:56 PM |
| Does default constructors gets created in all scenario | RyanJames | C and C++ | 1 | 07-12-2006 05:34 PM |