Geeks Talk

Prepare for your Next Interview




Getting a new Date from a Calender control in Playback?

This is a discussion on Getting a new Date from a Calender control in Playback? within the WinRunner forums, part of the Software Testing category; How is it possible to generate a new date in each test playback in WinRunner, using a calender control in the application? If I record and then playback the script ...


Go Back   Geeks Talk > Software Testing > WinRunner

Register FAQ Members List Calendar Mark Forums Read
  #1 (permalink)  
Old 12-24-2006
Junior Member
 
Join Date: Dec 2006
Location: Lahore
Posts: 3
Thanks: 0
Thanked 0 Times in 0 Posts
eiman is on a distinguished road
Getting a new Date from a Calender control in Playback?

How is it possible to generate a new date in each test playback in WinRunner, using a calender control in the application? If I record and then playback the script then the same date is selected each time, is it possible to generate a new date each time the script is payed back?
Reply With Quote
Sponsored Links
  #2 (permalink)  
Old 12-27-2006
Moderator
 
Join Date: Sep 2006
Location: Delhi (India)
Posts: 865
Thanks: 12
Thanked 81 Times in 65 Posts
jainbrijesh is on a distinguished road
Re: Getting a new Date from a Calender control in Playback?

Dear eiman,
You have to make changes in GUI map.There you have to make the changes in object property.Use regular expression to solve this problem because this is only the way to handle this type of problem, as i know about winrunner.
__________________
Brijesh Jain
brijesh.tester@yahoo.co.in
http://softwaretestingexpertise.blogspot.com
Reply With Quote
  #3 (permalink)  
Old 12-27-2006
Junior Member
 
Join Date: Dec 2006
Location: Hydarabad
Posts: 7
Thanks: 0
Thanked 0 Times in 0 Posts
vinayrudhra is on a distinguished road
Re: Getting a new Date from a Calender control in Playback?

wish you a happy new year
Reply With Quote
  #4 (permalink)  
Old 12-27-2006
Moderator
 
Join Date: Sep 2006
Location: Delhi (India)
Posts: 865
Thanks: 12
Thanked 81 Times in 65 Posts
jainbrijesh is on a distinguished road
Re: Getting a new Date from a Calender control in Playback?

Thanks and same for you also "Vinay".
__________________
Brijesh Jain
brijesh.tester@yahoo.co.in
http://softwaretestingexpertise.blogspot.com
Reply With Quote
  #5 (permalink)  
Old 07-25-2008
Junior Member
 
Join Date: Jul 2008
Posts: 1
Thanks: 0
Thanked 0 Times in 0 Posts
gyaneswarkr is on a distinguished road
Re: Getting a new Date from a Calender control in Playback?


Similar Threads
Reply With Quote
Reply

  Geeks Talk > Software Testing > WinRunner


Thread Tools
Display Modes


Similar Threads

Thread Thread Starter Forum Replies Last Post
Record and Playback feature Lokesh M Test Cases 2 03-01-2007 02:12 AM
Date Function in Oracle Robert Oracle 4 02-16-2007 06:15 AM
what is the control engine. schittoor Test Cases 1 02-12-2007 03:15 PM
release date Aam23 LoadRunner 1 01-28-2007 03:18 PM
Start up scripts in winrunner without Rec or Playback Lokesh M WinRunner 6 12-25-2006 11:05 PM


All times are GMT -4. The time now is 05:26 AM.


Powered by vBulletin® Version 3.6.8
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.1.0
Copyright © 2008 GeekInterview.com. All Rights Reserved