Geeks Talk

Prepare for your Next Interview


Welcome to the Geeks Talk forums.

You are currently viewing our boards as a guest which gives you limited access to view most discussions and access our other features. By joining our free community you will have access to post topics, communicate privately with other members (PM), respond to polls, upload content and access many other special features. Registration is fast, simple and absolutely free so please, join our community today!

If you have any problems with the registration process or your account login, please contact contact us.

Set up different stages of testing

This is a discussion on Set up different stages of testing within the Quality Center forums, part of the Software Testing category; Hello everybody! I just started to work with QC, we are starting to test on big projects and we will have a different stages of the testing: unit test, string ...

Go Back   Geeks Talk > Software Testing > Quality Center
Register Blogs FAQ Tag Cloud Calendar Mark Forums Read

Quality Center Quality Center

Reply

 

LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old 06-29-2009
Junior Member
 
Join Date: Jun 2009
Location: Latvia
Posts: 2
Thanks: 0
Thanked 0 Times in 0 Posts
ingrid1lv is on a distinguished road
Set up different stages of testing

Hello everybody!

I just started to work with QC, we are starting to test on big projects and we will have a different stages of the testing: unit test, string testing and integration testing. All of those will use one and the same testscripts but combined in different testcases.
My problem is that when you link the testscripts to requirements and it is already tested on unit test phase in analisys of requirement it already shown as tested. If i clone the testscript and will have test script for each of the test phases the requirements will be linked to too many scripts and progress won't be shown in analysys correctly as well.

Ideally i would like to see an analysys which shows the requirement coveraga and comletion by teststage. I would appreciate if you would share your experience how to organise the test plan for this.
Thanks Ingrid
Reply With Quote
Sponsored Links
  #2 (permalink)  
Old 07-06-2009
Junior Member
 
Join Date: Jul 2009
Location: Houston, TX
Posts: 1
Thanks: 0
Thanked 0 Times in 0 Posts
dkboyd2004 is on a distinguished road
Re: Set up different stages of testing

I set up the test scripts into different groups and name them for each unit. Ours include integration, staging and production. I am using QTP to generate my scripts so for each environment I use a different login, but the script steps are the same. I have also labeled them separately in the test lab. That way the results are shown separately for each unit. That way I can differentiate between the test run in each environment. Hope that helps.
Reply With Quote
Reply

  Geeks Talk > Software Testing > Quality Center

« Qc | QC Dashboard »
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are On
Pingbacks are On
Refbacks are Off


Similar Threads

Thread Thread Starter Forum Replies Last Post
smoke testing or system testing which testing is done by tester at first trainee_tester Testing Issues 12 09-16-2009 04:11 AM
active and passive stages in datastage bhanutej Data Warehousing 5 11-25-2008 12:41 AM
Defing Smoke testing, sanity testing, ad-hoc testing, monkey testing. bhushanbhangale Testing Issues 5 09-22-2008 05:03 AM
Extract the data from database using Active stages Geek_Guest Data Warehousing 0 05-04-2007 08:11 AM
Built-in and plugin stages, Chaning Null to Not Null and Types of lookup Geek_Guest Data Warehousing 0 04-06-2007 04:48 AM


All times are GMT -4. The time now is 03:24 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.3.1
Copyright © 2009 GeekInterview.com. All Rights Reserved