Geeks Talk

Prepare for your Next Interview




DataStage Parallel jobs Vs DataStage Server jobs

This is a discussion on DataStage Parallel jobs Vs DataStage Server jobs within the Data Warehousing forums, part of the Databases category; How DataStage Parallel jobs different from DataStage Server jobs? NOTE : [This question was asked by prasanth]...


Go Back   Geeks Talk > Databases > Data Warehousing

Register FAQ Members List Calendar Mark Forums Read
  #1 (permalink)  
Old 12-13-2006
Moderator
 
Join Date: Oct 2005
Posts: 662
Thanks: 1
Thanked 95 Times in 72 Posts
Lokesh M is on a distinguished road
DataStage Parallel jobs Vs DataStage Server jobs

How DataStage Parallel jobs different from DataStage Server jobs?

NOTE : [This question was asked by prasanth]
Reply With Quote
Sponsored Links
  #2 (permalink)  
Old 10-22-2007
Junior Member
 
Join Date: Sep 2006
Posts: 1
Thanks: 0
Thanked 1 Time in 1 Post
anupamkhannapec is on a distinguished road
Re: DataStage Parallel jobs Vs DataStage Server jobs

does someone knows this?
Reply With Quote
The Following User Says Thank You to anupamkhannapec For This Useful Post:
  #3 (permalink)  
Old 11-05-2007
Junior Member
 
Join Date: Nov 2007
Location: Bangalore
Posts: 2
Thanks: 0
Thanked 0 Times in 0 Posts
Prasanna2883 is on a distinguished road
Re: DataStage Parallel jobs Vs DataStage Server jobs

Hi,

I found the difference between Server and PX in one site. I hope this might help you guys.

The basic difference between server and parallel jobs is the degree of parallelism that PX offers.

Server job stages do not have in built partitoning and parallelism mechanism for extracting and loading data between different stages. All you can do to enhance the speed and perormance in server jobs is to enable inter process row buffering through the administrator. This helps stages to exchange data as soon as it is available in the link. You could use IPC stage too which helps one passive stage read data from another as soon as data is available. In other words, stages do not have to wait for the entire set of records to be read first and then transferred to the next stage. Link partitioner and link collector stages can be used to achieve a certain degree of partitioning paralellism.

All of the above features which have to be explored in server jobs are built in datastage Px. The Px engine runs on a multiprocessor sytem and takes full advantage of the processing nodes defined in the configuration file. Both SMP and MMP architecture is supported by datastage Px.
Px takes advantage of both pipeline parallelism and partitoning paralellism. Pipeline parallelism means that as soon as data is available between stages( in pipes or links), it can be exchanged between them without waiting for the entire record set to be read. Partitioning parallelism means that entire record set is partitioned into small sets and processed on different nodes(logical processors). For example if there are 100 records, then if there are 4 logical nodes then each node would process 25 records each. This enhances the speed at which loading takes place to an amazing degree. Imagine situations where billions of records have to be loaded daily. This is where datastage PX comes as a boon for ETL process and surpasses all other ETL tools in the market.
Reply With Quote
  #4 (permalink)  
Old 07-16-2008
Junior Member
 
Join Date: Jun 2008
Location: Hyderabad
Posts: 2
Thanks: 1
Thanked 0 Times in 0 Posts
giridatastage is on a distinguished road
Re: DataStage Parallel jobs Vs DataStage Server jobs

congratulations for sending good answer with suitable example
Reply With Quote
  #5 (permalink)  
Old 07-18-2008
Junior Member
 
Join Date: Jul 2008
Location: hyderabad
Posts: 2
Thanks: 0
Thanked 1 Time in 1 Post
mallikharjuna is on a distinguished road
Re: DataStage Parallel jobs Vs DataStage Server jobs

what are roles and responsibilities of an ETL developers/designer?
Reply With Quote
  #6 (permalink)  
Old 07-22-2008
Junior Member
 
Join Date: Jul 2008
Posts: 3
Thanks: 0
Thanked 0 Times in 0 Posts
dsamar is on a distinguished road
Re: DataStage Parallel jobs Vs DataStage Server jobs

1) The basic difference between server and parallel jobs is the degree of parallelism
Server job stages do not have in built partitoning and parallelism mechanism for extracting and loading data between different stages.

• All you can do to enhance the speed and perormance in server jobs is to enable inter process row buffering through the administrator. This helps stages to exchange data as soon as it is available in the link.
• You could use IPC stage too which helps one passive stage read data from another as soon as data is available. In other words, stages do not have to wait for the entire set of records to be read first and then transferred to the next stage. Link partitioner and link collector stages can be used to achieve a certain degree of partitioning paralellism.
• All of the above features which have to be explored in server jobs are built in datastage Px.

2) The Px engine runs on a multiprocessor system and takes full advantage of the processing nodes defined in the configuration file. Both SMP and MMP architecture is supported by datastage Px.

3) Px takes advantage of both pipeline parallelism and partitoning paralellism. Pipeline parallelism means that as soon as data is available between stages( in pipes or links), it can be exchanged between them without waiting for the entire record set to be read. Partitioning parallelism means that entire record set is partitioned into small sets and processed on different nodes(logical processors). For example if there are 100 records, then if there are 4 logical nodes then each node would process 25 records each. This enhances the speed at which loading takes place to an amazing degree. Imagine situations where billions of records have to be loaded daily. This is where datastage PX comes as a boon for ETL process and surpasses all other ETL tools in the market.

4) In parallel we have Dataset which acts as the intermediate data storage in the linked list, it is the best storage option it stores the data in datastage internal format.

5) In parallel we can choose to display OSH , which gives information about the how job works.

6) In Parallel Transformer there is no reference link possibility, in server stage reference could be given to transformer. Parallel stage can use both basic and parallel oriented functions.

7) Datastage server executed by datastage server environment but parallel executed under control of datastage runtime environment

8) Datastage compiled in to BASIC(interpreted pseudo code) and Parallel compiled to OSH(Orchestrate Scripting Language).

9) Debugging and Testing Stages are available only in the Parallel Extender.

10) More Processing stages are not included in Server example, Join, CDC, Lookup etc…..

11) In File stages, Hash file available only in Server and Complex falat file , dataset , lookup file set avail in parallel only.

12) Server Transformer supports basic transforms only, but in parallel both basic and parallel transforms.

13) Server transformer is basic language compatability, pararllel transformer is c++ language compatabillity

14) Look up of sequntial file is possible in parallel jobs

15) . In parallel we can specify more file paths to fetch data from using
file pattern similar to Folder stage in Server, while in server we can
specify one file name in one O/P link.

16). We can simulteneously give input as well as output link to a seq. file
stage in Server. But an output link in parallel means a reject link, that
is a link that collects records that fail to load into the sequential file
for some reasons.

17). The difference is file size Restriction.
Sequential file size in server is : 2GB
Sequential file size in parallel is : No Limitation..

18). Parallel sequential file has filter options too. Where you can specify the file pattern.
Reply With Quote
Reply

  Geeks Talk > Databases > Data Warehousing


Thread Tools
Display Modes


Similar Threads

Thread Thread Starter Forum Replies Last Post
Software Jobs tsftsf Interviews 3 06-20-2008 11:28 AM
Datastage Interview Questions Lokesh M Data Warehousing 8 04-28-2008 05:11 AM
DNS server in Windows server 2000 FantaGuy Web Servers 2 12-13-2006 02:21 PM
Microsoft CRM : Install Microsoft Dynamics CRM 3.0 Server using a Microsoft Exchange Server cluster environment Jim.Anderson Microsoft CRM 0 09-27-2006 06:39 AM
Finding Your First Job - Researching Jobs admin Interviews 0 05-27-2006 11:15 AM


All times are GMT -4. The time now is 12:29 AM.


Powered by vBulletin® Version 3.6.8
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.1.0
Copyright © 2008 GeekInterview.com. All Rights Reserved