Geeks Talk

Prepare for your Next Interview


Welcome to the Geeks Talk forums.

You are currently viewing our boards as a guest which gives you limited access to view most discussions and access our other features. By joining our free community you will have access to post topics, communicate privately with other members (PM), respond to polls, upload content and access many other special features. Registration is fast, simple and absolutely free so please, join our community today!

If you have any problems with the registration process or your account login, please contact contact us.

entry criteria

This is a discussion on entry criteria within the Testing Issues forums, part of the Software Testing category; what is the entry criteria and exit criteria for the functional testing ? could any one say please...

Go Back   Geeks Talk > Software Testing > Testing Issues
Register Blogs FAQ Tag Cloud Calendar Mark Forums Read
  #1 (permalink)  
Old 10-31-2006
Junior Member
 
Join Date: Oct 2006
Location: hyderabad
Posts: 12
Thanks: 1
Thanked 0 Times in 0 Posts
yagnkan is on a distinguished road
entry criteria

what is the entry criteria and exit criteria for the functional testing ?
could any one say please
Reply With Quote
Sponsored Links
  #2 (permalink)  
Old 10-31-2006
Expert Member
 
Join Date: Sep 2005
Posts: 110
Thanks: 8
Thanked 28 Times in 15 Posts
suji is on a distinguished road
Re: entry criteria

Entry criteria: the conditions that must exist before a unit of project work can commence.

Exit criteria: the conditions that must exist before a unit of project work can be deemed complete.

Entry criteria for unit testing phase are: the following documents have been completed, reviewed and approved:
1. Business requirement document complete
2. Program required documents complete
3. Preliminary software development project plan
4. Phase 1 planning
5. Functional specification
6. High-level design specifications
7. Software development project plan approved
8. Software verification plan approved
9. Software configuration management plan
10. Quality assurance plan approved.

Exit criteria for the unit testing phase are:
1. Unit test has been passed
2. The module resides in a baseline directory
3. The project is code-complete.

There are no missing features or media elements
4. All priority a bug have been fixed and closed
5. Internal documentation has been updated to reflect the current state of the product.

Note: unit testing will be performed mostly by the developer.

Entry criteria for integration testing phase are:
1. The project is code-complete. There are no missing features or media elements
2. The product satisfies the performance and memory requirements specified by the functional spec.
3. Software/curriculum have run and passed a sanity test that has been provided by the qa group.

4. All priority a bug have been fixed and closed
5. Internal documentation has been updated to reflect the current state of the product.
6. Curriculum has done a content review of the lessons.

Exit criteria for integration phase are:
1. The integration engineer has tested for install ability.
2. All priority a bug have been fixed and closed.
3. Internal documentation has been updated to reflect the current state of the product.
4. The technical lead has submitted all files for integration accompanied by release notes.

Entry criteria for system testing phase are:
1. Qa has spot tested content, features, and functionality of the product and verified that it is feature-complete.
2. The user interface and the feature set are frozen.
3. The final cd-rom layout has been determined.
4. The technical lead has submitted all files for integration accompanied by release notes.
5. The integration engineer has tested for install ability.
6. All priority a bug have been fixed and closed.
7. Internal documentation has been updated to reflect the current state of the product.

Exit criteria for system testing the exit criteria for the system testing phase are:
1. Final publications draft of product publications, including the quick start guide, has been reviewed, tested in qa, and approved by the core team.
2. All priority a bug have been fixed and closed.
3. The software runs on all the product’s supported hardware and software configurations.
4. The product is compatible with third-party products as specified in the functional spec.

Final entry criteria the entry criteria for the final phase are
1. Quality assurance plan approved.
2. The work has been approved and signed off by product marketing
3. Final publications draft of product publications, including the quick start guide, has been reviewed, tested in qa, and approved by the core team.
4. All priority a bug have been fixed and closed.
5. The software runs on all the product’s supported hardware and software configurations.
6. The product is compatible with third-party products as specified in the functional spec. Answer by venkat ref: http://www.geekinterview.com/question_details/25610

Last edited by suji; 10-31-2006 at 02:59 PM.
Reply With Quote
The Following 4 Users Say Thank You to suji For This Useful Post:
  #3 (permalink)  
Old 11-01-2006
Junior Member
 
Join Date: Oct 2006
Location: hyderabad
Posts: 12
Thanks: 1
Thanked 0 Times in 0 Posts
yagnkan is on a distinguished road
Re: entry criteria

thanks a lot suji
it's very useful information that u have sent
any way nice to meet to u
Reply With Quote
  #4 (permalink)  
Old 11-02-2006
Expert Member
 
Join Date: Jun 2006
Posts: 140
Thanks: 2
Thanked 12 Times in 9 Posts
Jim.Anderson is on a distinguished road
Re: entry criteria

Thanks Suji for pulling out nice questions with answer. Jim
Reply With Quote
The Following User Says Thank You to Jim.Anderson For This Useful Post:
  #5 (permalink)  
Old 03-13-2009
Junior Member
 
Join Date: Mar 2009
Location: India
Posts: 1
Thanks: 0
Thanked 0 Times in 0 Posts
rajanikc is on a distinguished road
Re: entry criteria

What are the Exit and Entry criteria for the Functinal and Regression testing
Reply With Quote
Reply

  Geeks Talk > Software Testing > Testing Issues

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are On
Pingbacks are On
Refbacks are Off



All times are GMT -4. The time now is 06:42 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
Content Relevant URLs by vBSEO 3.3.1
Copyright © 2009 GeekInterview.com. All Rights Reserved