A telephone cable is to be run from a junction point on the bank of a river 900 meters wide to an office that is located 3000 meters downstream on the opposite bank. If the cost of laying cable under water is Rs. 5 per meter and that of laying overhead on land is Rs. 4 per meter, find the point downstream where the cable is to cut across the river.
(a) 450
(b) 1800
(c) 2800
(d) 2100
(e) 2700
This question is related to TCS Interview

Questions by kavitha.raju

Showing Answers 1 - 3 of 3 Answers

bangers

  • Nov 22nd, 2010
 

1800. i think by laying this the total cost will be much less