Testing Team and QA Team
What is the difference between testing team and QA team?


  
Total Answers and Comments: 3 Last Update: March 26, 2008     Asked by: jyothivdaru 
  
 Sponsored Links

 
 Best Rated Answer
Submitted by: nids23
 

We also call testing team as QC team and the differences between QA and QC team are listed below:
1. Quality Assurance makes sure you are doing the right things, the right way whereas Quality Control makes sure the results of what you've done are what you expected.
2. QA focuses on building in Quality and hence preventing Defects, QC focuses on Testing for quality and hence detecting defects.
3. QA: Deals with process, QC: Deals with product.
4. QA: for entire life cycle, QC: for testing part in SDLC
5. QA is preventive process, QC is corrective process



Above answer was rated as good by the following members:
rajalakshmim
March 07, 2008 15:25:39   #1  
ramakrishnavidala Member Since: March 2008   Contribution: 3    

RE: Testing Team and QA Team
testing team is nothing but QC team they will test the application in testing phase.
Qa team people will check each and every outcome document right from the initial phase to ending of all the phases of sdlc they will involve internal audits ans walkthroughs.

 
Is this answer useful? Yes | No
March 20, 2008 07:33:18   #2  
Manvi Arora Member Since: January 2008   Contribution: 17    

RE: Testing Team and QA Team
QC (Quality Controller) team involve in the testing of the Application. Quality control checks ensure that equipment is working properly the operator is performing appropriately and that malfunctions or false readings do not go undetected. QA (Quality Assurance) Team Involve in all activities from design development production installation servicing documentation Verification and validation. They are also l involve in internal audits and walkthroughs.


 
Is this answer useful? Yes | No
March 25, 2008 06:11:18   #3  
nids23 Member Since: January 2008   Contribution: 30    

RE: Testing Team and QA Team

We also call testing team as QC team and the differences between QA and QC
team are listed below:

1. Quality Assurance makes sure you are doing the right things the right way
whereas Quality Control makes sure the results of what you've done are what you
expected.

2. QA focuses on building in Quality and hence preventing Defects QC focuses
on Testing for quality and hence detecting defects.

3. QA: Deals with process QC: Deals with product.

4. QA: for entire life cycle QC: for testing part in SDLC

5. QA is preventive process QC is corrective process


 
Is this answer useful? Yes | NoAnswer is useful 1   Answer is not useful 0Overall Rating: +1    


 
Go To Top


 Sponsored Links

 
About Us -  Privacy Policy -  Terms and Conditions -  Contact -  Ask Question -  Propose Category -  Site Updates 

Copyright © 2005 - 2009 GeekInterview.com. All Rights Reserved

Page copy protected against web site content infringement by Copyscape