A power cable is to be run from a power plant on the bank of a river 900 meters wide to a factory that is located 3000 meters downstream on the opposite bank. If the cost of laying cable under water is Rs. 5 per meter and that of laying overhead on land is Rs. 4 per meter, find the point downstream where the cable is to cut across the river. (a) 450 (b) 3900 (c) 1800 (d) 2100 (e) 2700