GeekInterview.com
  I am new, Sign me up!
 
GeekInterview.com  >  Placement Papers  >  TCS  >  COBOL
Go To First  |  Previous Question  |  Next Question 
 COBOL  |  Question 17 of 44    Print  
consider the following PROCEDURE DIVISION entry
OPEN EXTEND IN-FILE
identify the correct statement
a.organization of IN-FILE is sequential and records can be added in the beginning
b.organization of IN-FILE is sequential and records can be added in the end
c.organization of IN-FILE is indexed and records can be added in the beginning
d.organization of IN-FILE is indexed and records can be added in the end

  
Total Answers and Comments: 1 Last Update: February 12, 2007   
  
 Sponsored Links

 
 Best Rated Answer
Submitted by: dhana
 
The answer is b.

Above answer was rated as good by the following members:
Mainframer18
February 12, 2007 04:34:43   #1  
dhana        

RE: consider the following PROCEDURE DIVISION entry
The answer is b.
 
Is this answer useful? Yes | NoAnswer is useful 1   Answer is not useful 0Overall Rating: +1    

 Related Questions

Consider the following piece of code 01 GROSS-PAY 05 BASIC-PAY PIC 9(5) 05 ALLOWANCES PIC 9(3) if BASIC-PAY has a value 1000 and ALLOWANCES has a value of 250, what will be displayed by the statement DISPLAY GROSS-PAY a.1250 b.01000250 c.01250 d.1.250

Consider two data items 77 W-A PIC 9(3)V99 VALUE 23.75 77 W-B PIC ZZ9V99 VALUE 123.45 after the statement MOVE W-A TO W-B what will be W-B value? a.123.75 b.b23.75 (where b indicates space) c.023.75 d.invalid move

Consider the statement (incomplete) IF(A NUMERIC) DISPLAY A the variable A can be a.NUMERIC b.ALPHABETIC c.ALPHANUMERIC d.NUMERIC OR ALPHANUMERIC

What if any, is the syntax error in the following piece of code 01 B PIC A(7) 02 C PIC 9(4) IF(B NUMERIC) ADD 10 TO C a.the condition in the if statement is wrong b.noting is wrong c.because C is initialised.ADD 10 TO C is wrong d.both B and C shoud have same size.

Observe the following code 01 A1 05 B PIC 99 05 C PIC X(4) 01 A2 05 B PIC 99V99 05 C PIC A(4) pick out the valid statement from the following a.A1 and A2 can not have sub-ordinates b.A1 and A2 can have the same sub-ordinates but must have same PIC clause c.there is nothing wrong d.A1 and A2 can have same sub-ordinates provided they are not at 01 level

Study the following 01 A PIC 99V0 VALUE 5 01 B PIC 9V9 VALUE 6 01 C PIC 99V9 VALUE 2.5 01 D PIC 99 VALUE 3 COMPUTE A ROUNDED B C = A+B*C/D ON SIZE ERROR PERFORM PRINT-ERROR the comments of A.B.C after execution of the above statement are a.A=10 B=0 C=10 b.A=10 B=9.9 C=9.9 c.A=10 B=0 C=9.9 d.A=10 B=6 C=10

Consider the following progrm statements MOVE 0 TO SW.NO.OF.REC PERFORM PRI-OUT UNTIL SW=1 DISPALY NO.OF.REC STOP RUN PRE-OUT READ IN-FILE AT END MOVE 1 TO SW WRITE OUO-REC FROM IN-REC ADD 1 TO NO.OF REC if the IN-FILE contains 1000 records what value will be displayedafter the PERFORM is over?assume that N0.OF.REC has PIC 9(4) a.1000 b.1001 c.1 d.none of the above since there is a syntex error

Consider the following FD FILE-1 01 REC-1 PIC X(80) ...... WORKING-STORAGE SECTION 01 W-REC PIC X(90) ........ PROCEDURE DIVISION FIRST-PARA ....... READ FILE-1 INTO W-REC AT END MOVE 1 TO EOF-FLAG which of the following is true with respect to the above? a.REC-1 will contain nothing and W-REC will contain the contains of the record read b.REC-1 and W-REC contain the same data c.syntex is invalid and error will occur d.REC-1 and W-REC must be of same size

There is a file whose ORGANISATION is INDEXED.you want to read the records from the file in RANDOM fashion as well as sequentially. Then which of the access mode would you specify? a.SEQUENTIAL b.RANDOM c.DYNAMIC d .ACCESS MODE has nothing to do with it

Consider the following PROCEDURE DIVISION entry OPEN EXTEND IN-FILE identify the correct statement a.organization of IN-FILE is sequential and records can be added in the beginning b.organization of IN-FILE is sequential and records can be added in the end c.organization of IN-FILE is indexed and records can be added in the beginning d.organization of IN-FILE is indexed and records can be added in the end


 Sponsored Links

 
Related Articles

Planning and choosing the correct ERP

Planning and choosing the correct ERP It is very common to think that implementing a new software is an easy topic and can be solved in a few days However this is not always the case There are some systems that require more time than others for implementation and even more previous considerations ER
 

What is Data File

In a logical data model, the conceptual data model which is based on the business semantic is being defined. Thus, entities and relationships and corresponding table and column design, object oriented classes, and XML tags, among other things are being laid regardless of the database will be physica
 

What are the limitations with switch statement?

Switch statement is a powerful statement used to handle many alternatives and provides good presentation for C program. But there are some limitations with switch statement which are given below: Logical operators cannot be used with switch statement. For instance case k>=20: is not allowe
 

goto Statement

Why to avoid goto in C C has goto statement but one must ensure not to use too much of goto statement in their program because its functionality is limited and it is only recommended as a last resort if structured solutions are much more complicated. First let us understand the goto statement, its
 

XML Remote Calling Procedure

XML Remote Calling Procedure XML RPC or the XML Remote Calling Procedure is a set of compilations and implementations which allow certain programs to run on complex platforms or operating systems and allows them to make Remote Procedure calls on the Internet The Remote Procedure Calling Protocol use
 

JavaScript Window Object Open Method Part 2

JavaScript Window Object Open Method Part 2 In this JavaScript tutorial you will learn about JavaScript Window Object Open Method features of window object open method scrollbars status titlebar toolbar top width innerHeight innerWidth outerHeight outerWidth and hotkeys mosgoogle center scrollbars S
 

JavaScript Window Object Open Method

JavaScript Window Object Open Method In this JavaScript tutorial you will learn about JavaScript Window Object Open Method features of window object open method channelmode directories dependent fullscreen screenX screenY height left location menubar resizable alwaysLowered alwaysRaised mosgoogle ce
 

JES : Job Entry Subsystem

JES Job Entry Subsystem In this MainFrame tutorial you will learn about JES Job Entry Subsystem Job Scheduler types of JES HASP ASP Job management of MVS General Phases in a Job viz Input Conversion Processing Output Print and Purge mosgoogle center Job Entry Subsystems Job Scheduler JES is an MVS c
 

Procedure for getting Scholarships

Procedure for getting Scholarships If you have done a bit of research you are probably well aware of the fact that there is a great deal of money available for scholarships Having said that it is sad to see that so many students graduate from college with lots of students loans when they could have
 

How To Extend the Capabilities of ERP

How To Extend the Capabilities of ERP When the ERP boom begin in the 1990s it allowed a large number of companies to begin obtaining a clear view of their various operations and processes While it offered them a number of advantages there were still challenges that they needed to overcome The bigges
 

About Us -  Privacy Policy -  Terms and Conditions -  Contact -  Ask Question -  Propose Category -  Site Updates 

Copyright © 2005 - 2009 GeekInterview.com. All Rights Reserved

Page copy protected against web site content infringement by Copyscape