Latest Answer: PIN means project initiation note .it is the mail prepared by project manager to sent to the CEO of the software company inorder to get permission to start the project. ...
Latest Answer: Status meeting consists of the following points:1. What is the status of the task which was assigned previously to anyone.2. Is there any issue which any individual is facing in the current engazement.3. What are the tasks which should be done afterwards ...
what type of testing come under this?explain with an example
Latest Answer: Control structure testing is a part of white box testing. it includes following methods:1) Condition testing2) Loop testing3) Data validation testing.4) Branch testing/Path testing. ...
Latest Answer: The "oracle assumption" is that a tester can routinely identify the correct outcome of a test ...
Latest Answer: Documenat Testing is process to improve Usability, Reliability, Installability, Scalability, Liability. ...
Latest Answer: there r 2 changes 1.change control,2.version control     1.change control:in this if any changes r made in application based on customer requirement 2.version control:in this the versions no. r maintained ...
Latest Answer: Pre-Beta Testing is known as  Alpha Testing (done at development site) the phase is UAT(User Acceptance Testing). ...